Muğla Yatağan 100 -bed State Hospital, Muğla province, the investment of the Ministry of Health, is a state hospital project made by Krom Construction. The design and production project of the earthquake isolators that will form the seismic isolation system of the building with a reinforced concrete carrier system. undertook. Design, Production and Installation of TDP Earthquake Insolators Tis Technological Isolator Systems A.Ş. completed by. Information about the isolation system and isolators is given below.
| The name of the device produced | Tis Double Pendulum (TDP) | |
| Project Year | 2018 | |
| Total production custom | 191 (Structure: 183 + Prototype: 8) | |
| Displacement capacity of isolators | ± 270 mm | |
| Vertical load capacities of the isolators | 3700 /7500 /14800 /23600 kn |