TIS Earthquake Technologies
Ordu City Hospital is a 900 -bed City Hospital Project, undertaken by the Ministry of Health, the Ministry of Health, undertaken by Ekşioğlu Group & Ahes İnşaat. The design and production project of the earthquake isolators that will form the seismic isolation system of the building with a reinforced concrete carrier system. undertook. Design and Production of TDP Earthquake Insulators TİS Technological Isolator Systems A.Ş. completed by. Information about the isolation system and isolators is given below.
|
The name of the manufactured device is |
TİS Double Pendulum (TDP) |
|
Project year |
2021 |
|
Total production custom |
1034 (Structure: 1020, prototype: 14) |
|
Displacement capacity of the isolators |
± 360 mm |
|
Vertical load capacities of the isolators |
4600 /7200 /10000 /13200 /16800 /19700 /25100 kn |