• There is a solution to the earthquake.
TAI Wind Tunnel

TAI Wind Tunnel

The design and production project of the structural supports used in the wind tunnel project made by Sey Metal for TAI by Sey Metal. undertook. The design, production and assembly of the support used in the project was completed by TİS. The features of the support used in the project are given in the table below.

The name of the manufactured device is

TİS Pot Bearing (TPB)

Project year 

2022

Total production custom

170

Benzer Projeler

Contact Us

Start Your New Project Now

Contact us to learn more about earthquake protection.

Contact Us