Erzincan 500 -bed State Hospital, Erzincan province, the investment of the Ministry of Health, the contractor of the Pekintaş Yapı is a state hospital project. The design and production project of the earthquake isolators that will form the seismic isolation system of the building with a reinforced concrete carrier system. undertook. Design, Production and Installation of TDP Earthquake isolators on the construction site. completed by. Information about the isolation system and isolators is given below.
| The name of the device produced | Tis Double Pendulum (TDP) | |
| Project Year | 2020 | |
| Total production custom | 375 (Structure: 369 + Prototype: 6) | |
| Displacement capacity of isolators | ± 840 mm | |
| Vertical load capacities of the isolators | 7700 /10800 /13700 kn |