TIS Technological Isolation Systems
Stone 2 balanced console viaduct, located on the Erzurum-Kars Motorway, is built with a mid-range pushing-shedding method, a total length of 573 meters in a total of 8 openings, reaching the highest level of 120 meters. The balanced console of the bridge is built monolithic and connected to the openings of the Kenarayaklar approach with anti-secluded guided global supports. The design and manufacture of global supports that will make a displacement of ± 1000 mm during the maximum expected earthquake will be completed by TİS technological isolator systems.
The name of the devices produced is |
tis spherical bearing (TSB) |
Project year |
2021 |
Total production custom |
8 (anti-recruitment, guided slip) |
Vertical load capacities of the guards |
Pressure: 25500 / pull: 8500 kn |
Horizontal load capacities of the guards |
5300 kn |
Displacement capacity of the support |
± 1000 mm |
Rotating capacities of support |
± 0.02 radlArb |
Contact us to learn more about earthquake protection.