Tenaglia is a steel bridge project in Molise. TİS Technological Isolator Systems Inc. It has undertaken the design and production of seismic base isolators that will form the seismic isolation system of the structure. Information about the isolation system and isolation is given below.
|
The name of the manufactured device is |
TİS Double Pendulum (TDP) |
|
Project year |
2022 |
|
Total production custom |
4 |
|
Displacement capacity of the isolators |
± 250 mm |
|
Vertical load capacities of the isolators |
10000 kn |
Türkçe
English
Русский
España