TIS Earthquake Technologies
The Tosco-Romagnola – Fibbiana Interchange is a highway connection and interchange project implemented in Italy. The structural engineering works are designed to incorporate a seismic isolation system. TİS Teknolojik İzolatör Sistemleri A.Ş. is responsible for the design, production, and installation of the seismic isolators that make up the project’s seismic isolation system. Information regarding the isolators is provided below.
|
Names of the devices produced |
|
TİS Double Pendulum (TDP) |
|
Project year |
2025 |
|
|
Total production volume |
14 |
|
|
The displacement capacity of isolators |
± 250 mm |
|
|
Vertical load capacities of isolators |
7000 / 18000 kN |
Contact us to learn more about earthquake protection.