The Tunel Oriente Bridge 2 is a bridge/viaduct project located in Colombia. TİS Teknolojik İzolatör Sistemleri A.Ş. was responsible for the design and manufacture of the seismic isolators that make up the seismic isolation system. The production of TDP seismic isolators has been completed by TİS Technological Isolator Systems Inc. Information regarding the isolation system and the isolators is provided below.
|
The names of the devices produced |
|
TİS Double Pendulum arculated (TDPa) |
|
Project year |
2026 |
|
|
Total production volume |
20 |
|
|
The displacement capacity of isolators |
±579 mm / ±743 mm / ±7761 mm |
|
|
Vertical load capacities of isolators |
8600 / 28300 / 31000 kN |