TIS Earthquake Technologies
Kütahya City Hospital, the construction of the central district of Kütahya, the investment of the Ministry of Health, the contractuality of Güriş Holding (Dumlupınar Health Services) within the scope of a public-private partnership is a city hospital project. The design and production project of the earthquake isolators that will form the seismic isolation system of the building with a reinforced concrete carrier system. undertook. The design, production and assembly of TDP earthquake isolators has been completed. Information about the isolation system and isolators is given below.
| The name of the device produced | Tis Double Pendulum (TDP) | |
| Project Year | 2018 | |
| Total production custom | 506 (Structure: 498 + Prototype: 8) | |
| Displacement capacity of isolators | ± 560 mm | |
| Vertical load capacities of the isolators | 5000 /8300 /11600 /15300 kn |
Contact us to learn more about earthquake protection.