TIS Earthquake Technologies
Kahramanmaraş City Hospital is a 300 -bed hospital project, undertaken by the Ministry of Health. The design and production project of the earthquake isolators that will form the seismic isolation system of the building with a reinforced concrete carrier system. undertook. Production of TDP Earthquake Isolators Tis Technological Isolator Systems Inc. completed by. Information about the isolation system and isolators is given below.
|
The name of the manufactured device is |
TİS Double Pendulum (TDP) |
|
Project year |
2022 |
|
Total production custom |
369 (Structure: 361, prototype: 8) |
|
Displacement capacity of the isolators |
± 1000 mm |
|
Vertical load capacities of the isolators |
5300 /7500 /10600 /17200 kn |
Contact us to learn more about earthquake protection.