TIS Technological Isolation Systems
Pendik Municipality Service Building is the first municipal service building project of Istanbul with seismic isolator. The reinforced concrete structure is designed to include the seismic isolation system. TİS Technological Isolator Systems Inc. It undertook design, manufacturing and assembly of earthquake isolators that make up the seismic isolation system of the project. Construction continues. The details of the isolators are given below.
|
The name of the devices produced is |
TİS Double Pendulum (TDP) |
|
Project year |
2023 |
|
Total production custom |
79 (Structure: 67+ Prototype: 12) |
|
Displacement capacity of the isolators |
± 500 mm |
|
Vertical load capacities of the isolators |
9200/13500/15000/20400/21100/24500 kn |
Contact us to learn more about earthquake protection.